Table 3 include the steam turbine, generator, and generator control system. The costs do not include the boiler, steam loop, and controls. Non-fuel O&M costs range . from 0.6 to 1.0 ¢/kWh for the three steam turbines shown in Table 3. Similar to capital costs, there are economies of scale, and the O&M costs decline on a per kWh basis